
Worlds Strongest Dome Tents - Since 1976 - Portable Affordable Reliable
yurtdomes accessories shelters grip clips testimonials q&a manual map home sizes store
relieftents playadomes prepareshelters designs grodomes bubbledomes crystalcaves
© 1996 - 20011 Shelter Systems All Rights Reserved Deck Building: These plans are for a 20' Dome. If your Dome is larger or smaller adjust the measurements and the size of the wood you use. It is assumed that your land slops slightly. If our land is flat it will be even easier to build a deck.
Set your first pier block at the approximate center of where you want your dome to be. 10 feet up the hill from #1 set your #2 pier block. Using a string or tape run a straight line from #2 through the center of #1 and 10 feet more to set 3 #. 90 degrees to this line set piers #4 and #5. Use a clear 1/2" vinyl tube 25' long as a level (fill the tube with water 6" from each end - hold one end beside and above the #2 and the other
Using steel brackets attach the a 4" x 4" to the #3 pier block. Support the 4" x 4" with at least 3 temporary 2" x 2" to hold it vertical (use a level or plumb line to make it vertical).
Now attach a 20' 2" x 6" using steel brackets to the #2 and #3 blocks. Add two 10 foot 2" x 6" again using the leveling tube and the plumb line.
Add four more pier blocks "W, X, Y. Z" Place the other pier blocks by adding a 10' long string at #1 and using your tape measure to mark off 2' 4' 6' and 8'. Use your tube level and plum line to secure the 4"x 4"s. Then attach your 2" x 6"s.
Brace at least every other 4" x 4".
Proceed to add the other pair of blocks and 2" x 6"s use in joist hangers. Nail in 2" x 4"s, again using joist hangers, to support the middle of the 4' x 8' plywood. Nail or screw on 3/4" plywood. Let the plywood over hang the outer edge of the joists by about 6".
Set your dome on the plywood.
Turn the dome how you want it attach it temporally at the pole end with nails to pull the dome edge tight. With a pencil make a line on the inside of the dome to follow the edge of the dome. Remove the dome. Using a saw cut the decking to the line. Bolt sections 2"x 4" to the plywood so that they extend beyond the plywood to support the domes pole ends. Tie the clip cords at the pole ends to eye bolts in these 2" x 4"s. Adding height: The strongest way to add a 2 feet to the bottom of the dome is to first: This will maintain the integrity of the structure and only weaken it slightly. Patented and others pending. www.shelter-systems.com
1 1/2-YEAR GUARANTEE. If for any reason you're not completely pleased with your purchase, return it in original, dry and clean condition within 30 days of receipt for a full refund or exchange as you wish. All items in this catalog have a warranty against defects in materials and workmanship for 1 1/2 years. Should any product prove defective we will repair or replace it at no cost to you. Special Orders are not returnable. Read Snow and Wind Warnings. Order online with our Secure Order Form! Questions? Orders & Customer Service: Toll Free 866-777-1066 or 831- 464-2002 eleanor@shelter-systems.com Technical: 650-323-6202 bob@shelter-systems.com. Copyright © Shelter Systems 1976 - 2011 All Rights Reserved |